2. Drilling wall plugging and reinforcement of geological drilling engineering.
3. Water conservancy and hydropower project reservoir dam body infusion, cracks in the transmission tunnel cracks, seepage prevention, dam concrete anti-seepage reinforcement.
4. Subways, tunnels, culverts, sewage treatment tanks, seepage cracks, water leakage, water plugging.
5. Basement, underground garage, underground passages, seepage cracks leaking water, with water plugging.
6. Cracks in roof linings, through-wall pipes, corners, seepage water, and water plugging.
7. Cracks in structures, beams, columns, and plate structures. Gaowang injected epoxy resin.
Machine Features:
Rapid construction: It can be increased to 5000PSI working pressure in a few seconds, and the filling time is faster than other kinds.
Weight. Light: 7 kg body weight, easy to carry and move.
Maintenance is simple: no special training is required to repair, eliminating the need to stop work due to mechanical repairs.
Solid and durable: When the maximum pressure is 10000PSI, the body parts will not be deformed.
Continuous pressurization: The solvent can be effectively poured into the deep micro-cracks with honeycombs, which can effectively fill structural cracks and honeycombs.
Suitable materials: PU foam leakproofing agent, epoxy resin, no particulate low-dose liquid.
Pacel:
As picture show

